Giżycko
Completion date: 2017
In May 2017, we completed our implementation in Giżycko – Giżycko Cultural Center, and a few days later, the official opening took place. The GCK building has undergone a major refurbishment, and a modern room has been created inside it, where films can be shown (also in the 3D system), concerts and other cultural events can be organized.
The stage featured ETC devices (Source Four profile spotlights), DTS (JACK moving heads, PC SCENA S 1000W and SCENA S 2000W spotlights), MARTIN (MAC AURA moving heads).
The system is powered by the Philips Strand Lighting 24-channel Wallrack voltage regulator. The NA DMX Spltter 8 signal amplifier was also used. The control is carried out via the CHAMSYS MQ 40 N lighting console.
As part of the mechanical solutions, we made a lighting bridge and a lighting tower, as well as a curtain mechanism with drapes.