Riyadh / Saudi Arabia
Completion date: 2017
In December 2017, our company completed the assembly of three winches in the auditorium located on the newly built campus of the university in Riyadh – the capital of the Kingdom of Saudi Arabia.
As part of the project, we made a complete stage mechanics consisting of 2 lighting bridges of the stage, each 14 m long, and 1 arched lighting bridge, 22 meters long. The maximum load of each bridge is 500 kg. Constant movement speed: 0.2 m / s. A jump of 9.5 meters and 8 meters. Each bridge is equipped with 24 circuits supplying lighting apparatus and 2 Ethernet control lines. The power supply and control of individual lighting bridges is provided by e-spool e-spool e-chains®. Power and control device located directly behind the stage, equipped with a touch screen, ignition switch, a set of control buttons, main and emergency switch.
In December 2017, our company completed the assembly of three winches in the auditorium located on the newly built campus of the university in Riyadh – the capital of the Kingdom of Saudi Arabia.
As part of the project, we made a complete stage mechanics consisting of 2 lighting bridges of the stage, each 14 m long, and 1 arched lighting bridge, 22 meters long. The maximum load of each bridge is 500 kg. Constant movement speed: 0.2 m / s. A jump of 9.5 meters and 8 meters. Each bridge is equipped with 24 circuits supplying lighting apparatus and 2 Ethernet control lines. The power supply and control of individual lighting bridges is provided by e-spool e-spool e-chains®. Power and control device located directly behind the stage, equipped with a touch screen, ignition switch, a set of control buttons, main and emergency switch.