Gorzow
Completion date: 2011
The Gorzów Philharmonic Is A Member Of Center For Art Education. The Construction Of The Philharmonic Began In 2009, And Lasted Two Years. The Concert Hall Can Accommodate Nearly 600 People.
The P.S TEATR Company Delivered And Installed The Complete Lighting Control System (Strand Lighting Console – LIGHT PALETTE VL 3000 Including Remote Control System), Together With Stage Technology Lighting Devices (72 Luminaires With Various Angle Light Distribution, Including Two Followspots By Spotlight).
The Stage Has Been Equipped In Many Mechanical Devices, Including: Transport Trapdoors For The Piano With The Spiralift Drive, 3 Electrically Driven Decoration Stage Barrels With Safe Working Load Of 350 Kg, 6 Electrically Driven Lighting Ceilings With Safe Working Load Of 340 Kg And 30 Hoists For Acoustic Panels.